Interactive Job Aid
Hierarchy of Controls
The practical and effective method of reducing laboratory professionals’ exposure and risk of illness or injury is to use the hierarchy of controls, and all levels work together collectively. The risk control measure prioritizes eliminating or substituting hazards, followed by substituting engineering controls, administrative controls, and personal protective equipment. The aim is to proactively manage risks and promote a safe laboratory environment.